Home  |   Site Map  |   Inquire Now  |  
Home > News > Industry News >

Application and maintenance of hydraulic hammer running in pe


Pay attention to the work load of hydraulic hammer to adjust period, running in period of the work load generally do not exceed the rated load of the 80%, and to arrange for work, to prevent the occurrence of overheating caused by the continuous operation of the machine for a long time.
1., pay attention to observe the hydraulic hammer each instrument indicator, appear unusual, should stop in time to be excluded, in the reason not found, before the fault is not ruled out, should stop operation.
2. pay attention to check the hydraulic hammer lubricating oil, hydraulic oil, coolant, brake fluid, fuel oil (water) level and quality regularly, and pay attention to check the tightness of the engine. The oil shortage was found in the examination and the cause should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is suggested that grease should be added to the lubrication points during the running in period (except for special requirements).
3. keep the hydraulic hammer clean, adjust and fasten the loose parts in time to prevent the wear and tear of the parts or the parts lost due to the looseness.
4., the running off period, the machine should be mandatory maintenance, good inspection and adjustment work, at the same time pay attention to oil replacement.
In short, the hydraulic hammer in the running period of the use of maintenance requirements can be summarized as: to strengthen training, reduce load, pay attention to inspection, strengthen lubrication.

Inquire Now Back

You may be interested in:

TEL:+86-0513-88402888 FAX:+86-0513-88402135 MOB:+86-18012285888 Mail:stanhyc@163.com  Technical support:Nantong Tengen Planning Co., Ltd.
Company:China Sunrise Machinery  Address:Haitian International,East Street,Haian County,Jiangsu Province,China

Site map  |  Contact Us  |  Privacy Policy  |  Friendly-Links